Community Organizing Trainings

Georgia Virtual Community Organizing Summit

Sept 2026

Hosted by our friends at Community Action Works, this series of workshops featured community leaders, grassroots organizations, and experts. Together they shared information, experience, and tips and tricks to empower communities to address the proliferation of data centers and cryptomines across Georgia.

Thank you to partner organizations: Sierra Club, Science for Georgia, Georgia WAND, Georgia PIRG, Environment Georgia, and Georgia Interfaith Power and Light.

Kickoff: No One is coming to save you

This session is hosted by Max Haworth of Community Action Works.

Amy Sharma of Science for Georgia then where Georgia stands. The state now leads the nation in data center construction projects, with 83 planned facilities that could need 30 to 60 gigawatts of power. Georgia currently has only about 17 gigawatts of operating capacity. She explains why these AI hyperscale facilities differ from traditional data centers, how tax breaks expected to cost the state $3 billion in fiscal year 2027 and Georgia Power’s business model are driving the boom, and what nearby residents face: rising power bills, noise, light and heat pollution, generator emissions, strain on water supplies and power lines running through front yards. She ends with practical steps.

Hannah Baker of the Sierra Club Georgia Chapter closes the session with an interactive discussion where participants share where they are in their own local fights.

Pathways to Power: How everyday Georgians Can Take On Utilities and Data Centers

There are two parts to this session of the Georgia September Virtual Community Organizing Summit.

One, an overview of how power works in Georgia. Marcus Cole, Organizing Director at Georgia Interfaith Power & Light, opens with “Pathways to Power.” He argues that electricity isn’t just a commodity but a condition for taking part in modern life. He explains how Georgia Power, EMCs, municipal utilities, and the Public Service Commission shape what gets built, where it goes, and who pays for it. He then contrasts how ordinary customers connect to the grid with how data centers reshape the grid to serve them, through secret contracts, new methane pipelines and on-site fossil fuel generation. His core message is that utilities hold institutional power and tech companies hold economic power, but communities hold democratic and organizing power.

Two, a practical guide to building campaigns that win. Max Haworth, Deputy Director of Community Action Works, then walks through the principles of a winning campaign. They include setting clear short- and long-term goals, choosing a priority decision-maker, building a vote chart, picking a strategy, recruiting influential messengers, crafting a concise and consistent message, and escalating over time while evaluating along the way.

Map the Threat: A Free Tool to Track the Data Center Boom

Jessica Owens, Director of Data at Science for Georgia, gives a hands-on walkthrough of the organization’s free, open-source interactive map of Georgia’s data centers (https://bit.ly/DataCenterGA). The map shows planned and completed data centers and crypto mines alongside dozens of layers that help communities see what’s at stake near a proposed site. These include electric and gas transmission lines, power plants, EPA cleanup sites, PFAS detections in water, federal opportunity zones and high-poverty areas, schools, hospitals, cemeteries, Indigenous territories, wetlands, tree canopy, drought and heat-wave risk, and census data on employment and health insurance. Jessica shows how to use the legend, toggle layers, measure distances from a site to a nearby school, and download the underlying data. She also points out key findings, including that about 75% of proposed data centers would disturb wetlands. In the Q&A, participants discuss how communities can use the map proactively. They can spot the conditions that make an area a likely target and push for protective ordinances before a project arrives, and they can bring printed maps to decision-makers.

Don’t Take Their Word for It, Put It in Writing: Local Tools to Fight Data Center Harms

Andrea Young Jones, Government Relations and Public Policy Director at Georgia WAND, walks through the local policy tools communities can use when data centers and other large developments come to town. She explains why local action matters: the state has failed to set strong development standards, which leaves under-resourced local governments to fend for themselves. She then breaks down three tools.

1. Moratoriums are temporary pauses on development.
2. Ordinances are enforceable local laws.
3. Community benefits agreements (CBAs) are legally binding contracts between developers and community coalitions.

She also explains when each one works best. Andrea shares what a strong data center ordinance should include. It should use specific, mandatory language instead of suggestions, require conditional-use approval in industrial zones, and include decommissioning requirements and clear rules on noise, light, water and traffic. She also covers how to build a CBA that delivers lasting benefits beyond jobs and tax revenue: local hiring and workforce pipelines, environmental reporting, infrastructure improvements, renewable energy commitments, independent audits, and real penalties when violations happen. She closes with ways Georgia WAND can support communities and an audience Q&A on CBA examples from other industries.

From the Capitol to the PSC: How to Fight Data Centers Statewide in Georgia

The focus moves from local action to the two state bodies with the most power over Georgia’s data center boom. Janette Gayer of Environment Georgia covers the General Assembly. She explains how the legislature works and tracks what has happened on data centers so far, from the 2024 bill to repeal the data center tax break that Governor Kemp vetoed, to the 2025–2026 session, when bills on data centers paying their own way, moratoriums, and transparency were introduced but none passed. She explains why many of these issues are likely to come back when the next session starts in January 2027.

Bailey Shea of the Southern Environmental Law Center then demystifies the Georgia Public Service Commission. The PSC decides how much Georgia Power can build and who pays for it, and it has approved a massive expansion that would nearly double the state’s generation capacity. Bailey explains how large data center contracts, including OpenAI’s 3.2-gigawatt deal in Effingham County, can be approved by default after 30 days without a vote by the elected commissioners. She also shows how roughly 2,700 public comments helped win new protections, including public contract summaries, regular reporting from Georgia Power, and a first-ever PSC hearing in Savannah. Both speakers share concrete ways to get involved: contacting legislators, commenting at PSC hearings, and joining statewide advocacy coalitions.

Training & Resources: You Passed a Moratorium; Now What?

From Data Center Working Group